Metro 10 minute weekday frequency arrives from December as part of timetable improvements
As part of her drive to transform the Tyne and Wear Metro, North East Mayor Kim McGuinness has announced that service frequency is to be improved, with a new weekday timetable delivering six trains per hour being introduced.
The ten-minute frequency on each Metro line (equalling every four to six minutes through the centre of Newcastle and Gateshead) will help cut waiting times, improve customer experience and support future economic growth across the region — with a 20% increase in the weekday service.
The new timetable has been developed using customer demand and operational data and includes a range of service improvements, including adjusted frequencies and earlier and later journeys on parts of the system.
The new timetable has been made possible by all 46 new Metro trains becoming available for service, and thanks to the Metro Flow project (in 2022) – which delivered dual track infrastructure in South Tyneside. The £362m fleet has helped secure the future of Metro and has shown improved reliability and punctuality – paving the way for increased frequency and improved accessibility and customer experience.
Train frequency will initially increase on services from St James to South Shields on the Yellow Line and between Airport and Pelaw on the Green Line. The ten-minute frequency will then be introduced to the Sunderland line once specialist infrastructure upgrades and testing work are completed, scheduled for Spring 2027.
Upgrades to the Network Rail owned Sunderland line will allow the new fleet to enable its regenerative breaking feature, which will store and convert unused breaking energy to help power trains, helping to reduce energy costs.
The timetable changes underline the Mayor’s commitment to deliver a world class public transport network in North East England.
North East Mayor Kim McGuinness said: “Starting from December, we’re bringing in more trains every week, including at least six trains an hour from St James to South Shields and between Airport and Pelaw– that’s a train every 10 minutes. And it’s a train about every five minutes at busy stations like Haymarket, Central and Gateshead, meaning less time waiting at your local station and a better, safer and more frequent Metro for so many passengers.
“But I know that’s not good enough because for people in Sunderland these improvements will be delayed. Which is why I am making clear that from the spring, once further necessary upgrades have been made, this frequency will also be introduced to the Sunderland line, meaning we’ll have a fully upgraded Metro timetable for all.
“Every person in our region deserves a world class transport network. We promised to make Metro better for local people, and we’re delivering. We have our entire new fleet out on the network, performance is improving, and we’ve made travel more affordable. The increase in services is another step towards better, safer journeys for people in our whole region.”
Cathy Massarella, Managing Director of Nexus, said: “The new Metro timetable is going to be transformative for our customers, and has been made by possible by the roll out of our new train fleet.
“Introducing six trains per hour is a major step forward and will give our customers a turn-up-and-go service, offering greater convenience and reduced waiting times.
“The new timetable provides more capacity for future growth, helps realise the benefits of our new fleet, and makes public transport an even more attractive choice for people travelling across the region.
“Introducing our new train fleet combined with our track dualling work in South Tyneside, the Metro Flow project, have paved the way for this change.
“Customers across most of the system will benefit from the increase from December, with the Sunderland line scheduled to follow once specialist infrastructure upgrades and testing work are completed.”
Further information and updated timetables will be available on the Travel North East website ahead of the new timetable coming into effect from 13 December.
December 2026 train frequency and main changes at a glance
Monday-Friday
- 20-minute frequency on each line before about 6.30am.
- 10-minute frequency on each line from about 6.30am until 6.30pm (depending on location and direction). 4–6 minute frequency between South Gosforth and Pelaw.
- 15-minute frequency on each line from 6.30pm until end of service. The same as the current timetable, but with additional turnaround time on the yellow line.
- Earlier first trains towards Newcastle city centre from: Benton P1 , Tynemouth P1and P2, North Shields P1, Howdon P2, Bede P2, St James and Airport.
- Later last trains from Newcastle to: Park Lane, Kingston Park, Longbenton (via Whitley Bay), Tynemouth and Benton.
Saturday
- 20-minute frequency from start of service until about 9.30am.
- 12-minute frequency from about 9.30am until 6pm.
- 15-minute frequency on each line from 6.30pm until end of service. The same as the current timetable, but with additional turnaround time on the yellow line.
- Earlier first trains from: Benton P1 (towards Newcastle city centre), South Gosforth (to Airport), Tynemouth (to South Shields), Manors P1 (towards Whitley Bay) and Airport.
- Later last trains from Newcastle to: Park Lane, Kingston Park, Longbenton (via Whitley Bay), Tynemouth and Benton.
Sunday
- 20-minute frequency from start of service until about 10am. (An increase from the current 30-minute frequency to meet customer demand).
- 15-minute frequency from 10am until end of service, with additional turnaround time on the yellow line.
- Earlier first trains from: Benton P1 (towards Newcastle city centre), Tynemouth (towards South Shields), Airport, Manors P1 (towards Whitley Bay).
- Later last trains from Newcastle to: Park Lane, Kingston Park, Longbenton (via Whitley Bay), Tynemouth and Benton.
More like this
View all news26 August 2026
Photography project captures candid moments on Metro
Two year project shows life through a lens
12 October 2026
Public affairs stalwart to retire after 38 years with Nexus
Lynne has dedicated her career to public transport
28 July 2026
Metro appears in Newcastle United away kit launch
Filming was on board the new trains
19 July 2026
Nexus proud to support Peter Rabbit art trail in aid of St Oswald’s Hospice
A total of 96 sculptures have gone on display